-
A new design with Liquid Glass makes iPad even more vibrant and delightful to use.
-
A new, intuitive windowing system gives you more power and flexibility.
-
You can now put folders in the Dock for easier access to them.
-
The Preview app comes to iPad — a home for all your PDFs.
-
A true glow-up.
Liquid Glass brings a new look and more vitality to everything you see — and touch.
-
A gorgeous Lock Screen.
The time dynamically adapts to your photo wallpaper and notifications, keeping your subject in view. When you move your iPad, your photo comes to life with a new 3D effect.3
-
Updated app icons.
Take your pick from updated light or dark appearances, new colour-tinted icons, or a stunning clear look.
-
Your controls easily at hand.
Liquid Glass refracts and reflects content in real time, bringing even more clarity to navigation and controls.
-
More elegant apps.
The new design keeps familiar elements of your favourite apps, refreshing them so they feel even more vibrant.
-
More powerful windowing.
Open more windows at once, and resize and arrange them your way.
-
Window tiling.
Arrange windows with a flick to the left or the right. And now you can also split your iPad screen into thirds or quarters.
-
New ways to control your windows.
A familiar set of controls lets you close or minimise your windows, take them full screen or arrange windows into easy-to-view layouts.
-
Exposé.
Switch to the window you need. Simply swipe up and hold to see all your windows spread out, then tap to bring one to the front.
-
Menu bar.
Quickly find commands you need in an app with the new menu bar, which is always available with a swipe down from the top of the screen.
-
Folders in the Dock.
Access your downloads, documents and more with folders in the Dock, now on iPad.
-
A supercharged Files app.
Find what you’re looking for faster with new folder colours and customisation options. An updated list view gives you resizable columns and collapsible folders. And you can set the default app for opening specific file types.
-
Preview comes to iPad and works with Apple Pencil.
Open, edit and mark up PDFs and images with this easy-to-use app, designed to work great with Apple Pencil.4
-
Background Tasks.
Export or download large files and run other computationally heavy processes in the background while you do other things.
-
Live Translation.
Automatically translate texts in Messages1, display live translated captions in FaceTime and get spoken translations for calls in the Phone app.2
-
Accelerate your workflows.
Intelligent actions in Shortcuts can summarise text, create images or tap directly into Apple Intelligence models to provide responses that feed into your shortcut.
-
More ways to express yourself with images.
Mix emoji and descriptions to make something brand-new. In Image Playground, discover additional ChatGPT styles. And have even more control when making images inspired by family and friends using Genmoji and Image Playground.
-
Smarter reminders.
With Apple Intelligence, Reminders can suggest tasks, shopping items and follow-ups based on emails, websites or other content on your device. It can also organise related reminders into sections within a list.
-
The Phone app comes to iPad.
Make and take calls and enjoy the familiar features from iPhone, like Call Screening6, Hold Assist7 and Live Translation.2
-
Screen new senders.
Approve unknown numbers with new screening tools that detect spam and give you control over who appears in your conversation list in Messages.
-
Add a background to any conversation.
Select from stunning built-in options or choose any of your own photos to bring a distinct personality to your Messages conversations.
-
Contact Posters.
Incoming calls on Phone and FaceTime feature more personalisation that looks gorgeous on the expansive iPad screens.
-
Polls in Messages.
Create a poll to let the group chat decide. Everyone in the conversation can contribute options and watch as votes come in.